Forty-cabinet fit-out delivered in six weeks.

An engineer kneels at an open rack with a laptop on his knee, reaching in to a patch panel.Stand-in footage

The outcome.

  1. Delivered inside the window.

  2. Zero patching errors at certification.

  3. Handover pack accepted first time.

Example

The brief.

A colocation client needed a forty-cabinet fit-out racked, cabled and handed over inside a fixed access window, with the client's operations team accepting the documentation first time.

What made it hard.

The site's method of procedure was strict, the access windows were short and the client had lost time on a previous supplier's errors at test.

Roles placed.

Rack and stack technicians, Structured cabling technicians, Network deployment engineer.

“The engineers arrived knowing our protocols. That has not happened before.”

Operations lead, colocation provider · Example
  1. Specify
  2. Design
  3. Procure
  4. Deploy
  5. Hand over
  6. Manage
Ink, the phases Riviot ran. Gray, covered by the client.